40L Complete Dosing System

$12,500.00

40L Complete Dosing System
For Wiped Film Evaporators 

The 40L Complete Dosing System by Beaker & Wrench® is a continuous feed system that connects to any Wiped Film Evaporator effortlessly. Optimize your time and end results by dialing into your feed system. The Feed Gear Pump by Beaker & Wrench® gives the operator control over flow rate and freedom to load material into the flask without breaking deep vacuum. Once attuned with the flow rate, calculations become less of a guessing game and more of a formula. Distill as slow or as fast as needed!

The contents of this system include:

  • Heated 40L feed flask
  • Crude Cozy™
  • Digitally operated, heated Feed Gear Pump
  • 4″ tri-clamp port on feed lid
  • Inlet adapter (for your still)
  • 6′ Heated Transfer Line (not pictured)
    • Wattage: 90/ft, 120 Volts
    • Maximum Temp: 150°C
  • UL Listed 3 Channel PID Temperature Controller
    • UL: E510826

How does it work?
Crude is loaded into a heated feed flask, which then flows through the heated Gear Pump. The Gear Pump moves fluid through the gears while maintaining vacuum. Oil is then pulled towards the still body, ready for distillation!

Cleaning:
Every Operator has their own preference in how they clean their Wiped Film Evaporator. Ethanol, Isopropyl alcohol or vegetable oil are viable options when looking to clean your Wiped Film. Step-by-step instructions are included in the manual!

Beaker & Wrench® offers three cleaning solutions: Daily Kleen™ and Mega-Kleen™. Click to see which one caters to your specific needs!

Installation:

Are you interested in having a Beaker & Wrench® technician install your Complete Dosing System? Click here for a quote! The advantage with having a technician perform installation is you can ask any and all questions necessary on how to process with your Wiped Film Evaporator!

What is the warranty?
1 year manufacturer’s warranty on parts for exchange. Customer has 5 days from day of delivery to inspect equipment for breakages or damage.

** Please indicate the inlet size of your still in the Notes section of your purchase. This will help us adapt to your set-up.

2-3 Weeks Lead Time!

SKU: N/A Category: